Existing services traced before the first hammer

By the Kolo home interiors team · Updated

Why — act while you have leverage

Concealed pipes and cables do not announce themselves. Cutting one turns a day of demolition into a week of repair, and the damage is inside a wall you were about to finish.

What — examine the details

What to look at

  • Detector run over every wall to be opened, and the findings marked on it
  • Circuits switched off and tested dead, not just switched
  • Existing service drawings asked for before starting
How

How to check it yourself

Walk the walls with a cable and pipe detector before breaking, and mark what is found. Where drawings of the existing services exist, get them — in a flat the builder usually has them. Switch off and confirm dead rather than trusting a labelled board.

Where this comes from: IS 732 — Code of Practice for Electrical Wiring Installations; established trade practice for services tracing (indian standard or building code)