Moved drains still fall the right way

By the Kolo home interiors team · Updated

Why — act while you have leverage

A relocated drain with too little fall does not fail immediately — it blocks slowly, months later, behind a finished wall or under a new floor.

What — examine the details

What to look at

  • Fall measured along the full length of the new run
  • No flat sections or back-falls where the pipe turns
  • The connection into the existing stack checked, not assumed
How

How to check it yourself

A waste line needs a continuous fall to the stack, and moving a WC or a sink often eats the fall that was there. Check the fall along the whole new run with a level before it is covered, and confirm the connection point can still take it. This is the single most expensive interior mistake to correct.

Where this comes from: NBC 2016 Part 9 (Plumbing Services); IS 1742 — Code of practice for building drainage (indian standard or building code)