Every point tested live and recorded
Why — act while you have leverage
Every switch, socket and light tested working; every tap and joint checked for leaks; readings taken per circuit and written down. This is the loop-closing week for everything buried earlier - and it only happens while the vendor is still on site.
What to look at
- Every socket tested, not a sample per room
- Each switch traced to the light it actually operates
- Earth continuity confirmed at the points, not only at the board
How to check it yourself
At second fix everything is finally reachable. After handover half of it is behind furniture, and an untested point is found by whoever plugs something in.
Where this comes from: IS 732 — Code of Practice for Electrical Wiring Installations; IS 3043 for earthing continuity (indian standard or building code)