Kolo Verify
House construction · Electrical and plumbing checks

Plumbing pressure test before concealing pipes

By the Kolo house construction team · Updated

On your checklist as: “Plumbing pressure-tested before concealing”

Why — act while you have leverage

A concealed joint that weeps will be found by a stain on a finished wall. Testing before covering is minutes; finding it afterwards is a wall rebuilt and a room repainted.

What — examine the details

What to look at

  • A gauge reading photographed at both ends of the hold
  • Every concealed run tested, not a sample
  • Test done before plastering, not after
  • Pressure test record with gauge photographs

Documents to ask for

  • Pressure test record with gauge photographs
How

How to check it yourself

Concealed supply lines are pressure-tested and held before chasing is closed, with the gauge photographed at the start and end of the hold. Drainage lines are tested for water-tightness separately.

Where this comes from: NBC 2016 Part 9 (Plumbing Services); IS 2065 — code of practice for water supply in buildings (indian standard or building code)

More electrical and plumbing checks

The whole stage: Electrical and plumbing checks

Chat with us