Applies only if your house has a rubble foundation.

Why — act while you have leverage

A rubble wall without through stones is two thin walls leaning on each other. It stands until the ground moves, then splits down the middle — and nothing about the finished plinth shows whether they were laid.

What — examine the details

What to look at

  • Bond stones visible on both faces of the wall, not just one
  • Overlap of at least 150 mm where a pair is used instead of a single stone
  • Photographs of each lift before backfill closes the trench
How

How to check it yourself

Through bond stones run the full thickness of the wall. IS 1597 (Part 1) requires them in walls up to 600 mm thick, and where the wall is thicker a set of two or more overlapping each other by at least 150 mm. Count them on the exposed face before backfilling — afterwards there is no way to know.

Where this comes from: IS 1597 (Part 1):1992 — Construction of Stone Masonry, Rubble Stone Masonry (indian standard or building code)