As-built drawings and warranties handed over

By the Kolo house construction team · Updated

Why — act while you have leverage

The drawing showing where the concealed pipes and cables actually run is worth more than any other document in the file, and it is the one most often never asked for.

What — examine the details

What to look at

  • As-built marked up where site differed from drawing
  • Warranty start dates, not just certificates
  • Everything in one place, scanned
  • Waterproofing warranty
  • Appliance and fittings warranties

Documents to ask for

  • As-built drawings
  • Waterproofing warranty
  • Anti-termite treatment record
  • Appliance and fittings warranties
How

How to check it yourself

Ask for as-built drawings marked with any deviation from the approved plan, warranty documents for waterproofing, fittings and appliances, and the anti-termite treatment record. Store them where you can find them in ten years.

Where this comes from: NBC 2016 Part 6; standard practice for residential handover (established trade practice)