As-built drawings and warranties handed over
Why — act while you have leverage
The drawing showing where the concealed pipes and cables actually run is worth more than any other document in the file, and it is the one most often never asked for.
What to look at
- As-built marked up where site differed from drawing
- Warranty start dates, not just certificates
- Everything in one place, scanned
- Waterproofing warranty
- Appliance and fittings warranties
Documents to ask for
- As-built drawings
- Waterproofing warranty
- Anti-termite treatment record
- Appliance and fittings warranties
How to check it yourself
Ask for as-built drawings marked with any deviation from the approved plan, warranty documents for waterproofing, fittings and appliances, and the anti-termite treatment record. Store them where you can find them in ten years.
Where this comes from: NBC 2016 Part 6; standard practice for residential handover (established trade practice)
More handover checks before the final payment
- Snag list closed
- Warranty documents collected
- As-built drawings received
- Occupancy certificate obtained
- Snag list agreed in writing before the final payment