Kolo Verify
House construction · Plot and land checks before you build

Building rules feasibility checked

By the Kolo house construction team · Updated

Why — act while you have leverage

Confirm with your architect that coverage, setbacks, height and road-access rules allow the home you intend, before a single drawing is made. Designing first and checking later is how redesigns happen.

What — examine the details

What to look at

  • The jurisdiction confirmed in writing
  • Coverage, FAR, setback and height figures taken from the operative rule, not from the neighbour's house
How

How to check it yourself

Identify the jurisdiction — Panchayat means KPBR, Municipality or Corporation means KMBR — then test coverage, FAR, setbacks, height and access-road width before design begins. Rule 27 gives relaxed setbacks for plots under 125 square metres, about 3.09 cents: front 1.8 m, rear 1.0 m, sides 0.6 m. On a plot abutting a National, State or District road the setback is measured from the road centre-line and can override the small-plot relaxation. Plans must be certified by a registered Architect, Engineer, Town Planner or Supervisor per Appendix J1 competence limits. Permits are processed through K-SMART, the successor to Sanketham.

Where this comes from: KMBR 2019 / KPBR 2019 (amended through 2025) Rule 27, Appendix J1 (required by law)

More plot and land checks before you build

The whole stage: Plot and land checks before you build

Chat with us