Kolo Verify
House construction · Construction quotation and BOQ checks

What the quote leaves out, in writing

By the Kolo house construction team · Updated

Why — act while you have leverage

Most disputes are not about the price of what is in the quote - they are about what was never in it. Budget packages in Kerala commonly exclude the same items, and the exclusions are rarely printed as a list.

What — examine the details

What to look at

  • An exclusions list that exists at all
  • Each assumed item either in the scope or on the exclusions list - never in neither
  • The total of the excluded items, worked out before you compare two quotes
How

How to check it yourself

Ask for the exclusions as their own section, and check it against what these packages usually leave out: site clearing and earth filling, waterproofing, damp-proof course and anti-termite, external plumbing and the drain to the septic tank, lights and fans, wardrobes and kitchen, car porch and driveway, compound wall and gate, elevation detailing and cladding, and all interior work. Anything you assumed was included and is not, add up now.

Where this comes from: Kolo review of Kerala construction quotations and agreements (established trade practice)

More construction quotation and boq checks

The whole stage: Construction quotation and BOQ checks

Chat with us