Why your construction budget is wrong before you start

By Jery, founder of Kolo · Updated

Your budget decides your loan, your plan and how you judge every quote. Before anyone quotes, you need a figure of your own. Most homeowners don't have one, for three reasons.

Every figure here is an example, with the arithmetic shown. Your own numbers will differ; the reasons won't.

Reason 1 · What they know that you don't

Only the other side knows what your house should cost

You have a plan. You ask around, and everyone gives you a number per sq ft. Right now, the only people who know what your house should actually cost are the ones who want to build it.

A real cost comes from quantities: how much steel, cement, brick and tile your plan needs, and what each costs today. Contractors work this out every week. Most homeowners never see it done. So when quotes come in, you have nothing of your own to compare them with.

Say your house should cost ₹1.2 crore. A ₹1.35 crore quote looks normal if you've never seen the ₹1.2 crore figure. That's ₹15 lakh you can't spot.

₹1.35 crore quote − ₹1.2 crore real cost = ₹15 lakh

Reason 2 · How they are paid

A free estimate is rarely free

A contractor, an architect or a builder you know gives you a rough figure. It costs you nothing.

But the person giving it has a reason to pick a number. A low figure gets you started, and once the plan is approved and the loan is sanctioned, it's hard to stop. Nobody has to lie. The estimate just isn't made by someone working for your budget.

Say the estimate says ₹1 crore and the house really costs ₹1.25 crore. You find the ₹25 lakh gap after you've committed.

₹1.25 crore real cost − ₹1 crore estimate = ₹25 lakh gap

Reason 3 · Too much to line up

One small number, multiplied across the whole house

A proper estimate, called a bill of quantities or BOQ, lists hundreds of items: steel, cement, sand, bricks, tiles, wiring, pipes. Each one is a quantity times a rate.

A small error repeats across the whole house. And the quantities come from the structural design, which most of us can't read. So even a careful homeowner can't check them.

Say steel is estimated at 3.5 kg a sq ft, but your design needs 4 kg. On 3,500 sq ft, that's 1,750 kg more steel. At ₹70 a kg, that's about ₹1.22 lakh.

(4 − 3.5) kg × 3,500 sq ft = 1,750 kg × ₹70 = ₹1,22,500

What it adds up to

Say a ₹25 lakh gap in the estimate and ₹1.22 lakh in steel. That's over ₹26 lakh you find out about after you've committed.

₹25,00,000 + ₹1,22,500 = ₹26,22,500

Try it with your numbers

Steel quantity calculator

What you can do

None of this is your fault. The information sits with the people who price the work, and a per sq ft figure hides all of it.

The way through is a quantity-based estimate of your own, made by someone working for your budget, before the first quote arrives. Then every quote has something to be measured against.

The how

How to check it yourself

Step by step in our guides: what to look at, and the law, code or practice behind it.

Or let Kolo do it

Have a Kolo expert look at it

House construction cost estimate

What each stage of your build should cost, foundation to handover.

  • A low / likely / high band for every stage
  • A schedule you can hold contractor milestones against

Estimate · ready in 5 working days

See House construction cost estimate →

Available for sites anywhere in India except Kerala.

BOQ & material estimate

How much steel, cement, sand, blocks and tiles your house needs — so deliveries can be checked.

  • Quantities split by stage
  • An identical sheet to send every contractor

Quantity sheet · ready in 5 working days

See BOQ & material estimate →

Available for sites anywhere in India except Kerala.

About the author. Jery founded Kolo, which has worked with homeowners on over 3,000 homes, from the first architect meeting to handover.