Construction agreement: the clauses to check before you sign

By the Kolo house construction team · Updated

On your checklist as: “Agreement check passed”

Why — act while you have leverage

Payment tied to measurable work, a delay clause, a defect liability period, warranty terms, controlled brand substitution and a bounded escalation clause - verified present before you sign, while asking still costs nothing.

What — examine the details

What to look at

  • Each clause present or its absence noticed
  • The dispute-resolution mechanism named, not assumed
How

How to check it yourself

The clauses that carry the risk: scope and drawings incorporated by reference; payment linked to measurable stage completion; delay and liquidated damages; defect liability period; warranties, especially waterproofing; brand-substitution control; price-escalation bounding; scope-change and extra-work pricing mechanism; termination; dispute resolution, typically arbitration under the Arbitration and Conciliation Act 1996; and taxes stated inclusive or exclusive. Where a clause is silent the Indian Contract Act 1872 supplies defaults, including s.73 damages for breach — a poor substitute for express terms.

Where this comes from: Indian Contract Act 1872 s.73; Arbitration and Conciliation Act 1996; Advocates Act 1961 ss.29, 33; Bar Council of India v. A.K. Balaji (2018) 5 SCC 379 (required by law)