Kolo Verify
House construction · Construction agreement checks before you sign

There is a warranty, and it has a length

By the Kolo house construction team · Updated

Why — act while you have leverage

Several agreements carried no warranty of any kind. Without one, every defect that appears after handover is yours to pay for, however soon it appears.

What — examine the details

What to look at

  • A defect liability period with a number of months
  • A structural warranty, separately stated
  • What starts the clock - handover, not the last payment
  • What the warranty excludes
How

How to check it yourself

Look for two separate things: a defect liability period covering workmanship, and a structural warranty covering the frame. Each needs a length in months or years and a start date tied to handover. "Quality assured" is not a warranty. A guarantee offered in the same document that also pushes curing onto you is worth asking about.

Where this comes from: Consumer Protection Act 2019 for deficiency in service (context) (established trade practice)

More construction agreement checks before you sign

The whole stage: Construction agreement checks before you sign

Chat with us